HVAC Condensate Calculation — AHU Using Psychometrics

 HVAC Condensate Calculation — AHU Using Psychometrics We will calculate the condensate generated by an Air Handling Unit (AHU) using the psychrometric moisture-balance method, as commonly applied in HVAC energy management and CEM studies. 1. Given data Parameter Value Airflow rate 10,000 m³/h Entering air temperature 35°C Entering relative humidity 60% Leaving air temperature 13°C Leaving relative humidity 90% Operating duration 24 hours/day Atmospheric pressure 101.325 kPa (assumed) Assumption: the airflow is the actual volumetric flow at the entering-air condition, and the AHU removes moisture as the air passes over the cooling coil. 2. Calculate the humidity ratio The humidity ratio \(W\) is the mass of water vapour per kilogram of dry air. \[ W=0.621945\frac{P_v}{P-P_v} \] Where: \(P_v\) = partial pre...

HVAC Condensate Calculation — AHU Using Psychometrics

 HVAC Condensate Calculation — AHU Using Psychometrics

We will calculate the condensate generated by an Air Handling Unit (AHU) using the psychrometric moisture-balance method, as commonly applied in HVAC energy management and CEM studies.

1. Given data


Parameter

Value

Airflow rate

10,000 m³/h

Entering air temperature

35°C

Entering relative humidity

60%

Leaving air temperature

13°C

Leaving relative humidity

90%

Operating duration

24 hours/day

Atmospheric pressure

101.325 kPa (assumed)


Assumption: the airflow is the actual volumetric flow at the entering-air condition, and the AHU removes moisture as the air passes over the cooling coil.

2. Calculate the humidity ratio

The humidity ratio \(W\) is the mass of water vapour per kilogram of dry air.

\[ W=0.621945\frac{P_v}{P-P_v} \]

Where:

  • \(P_v\) = partial pressure of water vapour

  • \(P\) = atmospheric pressure, 101.325 kPa

Water-vapour pressure is calculated from:

\[ P_v=RH\times P_{ws} \]

Here, \(P_{ws}\) is the saturation vapour pressure at the measured air temperature.

Entering air: 35°C, 60% RH

Saturation vapour pressure at 35°C is approximately 5.627 kPa.

\[ P_{v1}=0.60\times5.627=3.376\text{ kPa} \]
\[ W_1=0.621945\frac{3.376}{101.325-3.376} \]
\[ \boxed{W_1=0.02144\text{ kg/kg dry air}} \]

Therefore, entering-air humidity ratio = 21.44 g/kg dry air.

Leaving air: 13°C, 90% RH

Saturation vapour pressure at 13°C is approximately 1.498 kPa.

\[ P_{v2}=0.90\times1.498=1.348\text{ kPa} \]
\[ W_2=0.621945\frac{1.348}{101.325-1.348} \]
\[ \boxed{W_2=0.008385\text{ kg/kg dry air}} \]

Therefore, leaving-air humidity ratio = 8.385 g/kg dry air.

3. Calculate the moisture removed

\[ \Delta W=W_1-W_2 \]
\[ \Delta W=0.02144-0.008385 \]
\[ \boxed{\Delta W=0.01305\text{ kg/kg dry air}} \]

The AHU removes approximately 13.05 grams of moisture per kilogram of dry air.

4. Calculate dry-air mass flow rate

Because the airflow is specified in m³/h, we first convert it to dry-air mass flow.

The specific volume of moist air per kilogram of dry air is:

\[ v=\frac{0.287042\,T_K(1+1.6078W_1)}{P} \]

Using the entering-air condition:

  • Absolute temperature: \(35+273.15=308.15\text{ K}\)

  • Humidity ratio: \(W_1=0.02144\)

  • Pressure: \(101.325\text{ kPa}\)

\[ v\approx0.9030\text{ m}^3/\text{kg dry air} \]

Therefore:

\[ \dot m_{da}=\frac{10,000}{0.9030} \]
\[ \boxed{\dot m_{da}\approx11,074\text{ kg dry air/h}} \]

5. Calculate AHU condensate production

The moisture-balance equation is:

\[ \dot m_w=\dot m_{da}(W_1-W_2) \]

Substitute the calculated values:

\[ \dot m_w=11,074(0.02144-0.008385) \]
\[ \dot m_w\approx144.54\text{ kg/h} \]

Since 1 kg of water is approximately 1 litre:

\[ \boxed{\text{Condensate}\approx144.5\text{ L/h}} \]

6. Calculate daily condensate production

For continuous operation over 24 hours:

\[ \text{Daily condensate}=144.54\times24 \]
\[ \boxed{\text{Daily condensate}\approx3,469\text{ L/day}} \]

FINAL ESTIMATED RESULTS

144.5

Litres per hour

3,469

Litres per day

Assumes 24-hour operation at constant airflow and constant entering/leaving air conditions.

7. Practical application in hospital facility management

This estimate can help with:

  • Condensate drain sizing: assess whether the drain pan and drainage system can handle the expected water flow.

  • Water recovery: estimate the potential quantity of condensate available for suitable non-potable reuse, subject to water-quality assessment and applicable requirements.

  • Energy management: understand the latent cooling load associated with moisture removal.

For reference, the estimated latent cooling load is approximately:

\[ Q_L\approx\frac{144.54\times2450}{3600} \]
\[ \boxed{Q_L\approx98.4\text{ kW}} \]

This represents the approximate latent heat removed through condensation, not the AHU's total cooling capacity.

Engineering note: The calculated value is a theoretical estimate. Actual condensate depends on measured airflow, coil bypass factor, operating conditions, and the air's humidity before and after the coil. For a hospital AHU, verify these conditions before using the result for final drain or water-recovery design.

Air-Conditioning Condensate Calculation with CEM

CEM = Certified Energy Manager. In HVAC energy management, condensate calculation helps estimate the water removed from air by a cooling coil, assess latent cooling load, and evaluate opportunities for condensate recovery.

The example below uses a hospital AHU operating at 10,000 m³/h, with entering air at 35°C and 60% RH, and leaving air at 13°C and 90% RH.

1. Understand the process

The cooling coil lowers the air temperature below its dew point. Water vapour then condenses on the cold coil surface, collects in the drain pan, and flows through the condensate drain.

Cooling and Dehumidification Coil Calculation Guide | Nexora



AC Drain Line Cleaning: 5 Easy Steps




Schematic of a typical draw-through commercial air-handling unit (AHU). | Download Scientific Diagram
10

2. Given data and assumptions


Parameter

Symbol

Value

Airflow

\(\dot V\)

10,000 m³/h

Entering air temperature

\(T_1\)

35°C

Entering relative humidity

\(RH_1\)

60%

Leaving air temperature

\(T_2\)

13°C

Leaving relative humidity

\(RH_2\)

90%

Atmospheric pressure

\(P\)

101.325 kPa

Operating time

\(t\)

24 h/day


Assumptions: steady operation, constant entering and leaving conditions, and airflow measured at the entering-air condition.

3. Main CEM calculation formula

The fundamental equation is the moisture balance:

\[ \boxed{\dot m_w=\dot m_{da}(W_1-W_2)} \]

Where:

  • \(\dot m_w\) = condensate production, kg/h

  • \(\dot m_{da}\) = dry-air mass flow, kg/h

  • \(W_1\) = entering humidity ratio, kg water/kg dry air

  • \(W_2\) = leaving humidity ratio, kg water/kg dry air

For water, \(1\text{ kg}\approx1\text{ litre}\).

4. Step-by-step psychrometric calculations

Step 1 — Find saturation vapour pressure

From psychrometric data or steam tables:

Temperature

Saturation vapour pressure

35°C

5.627 kPa

13°C

1.498 kPa

Step 2 — Calculate actual vapour pressure

Formula:

\[ P_v=RH\times P_{ws} \]

Entering air:

\[ P_{v1}=0.60\times5.627 =\boxed{3.376\text{ kPa}} \]

Leaving air:

\[ P_{v2}=0.90\times1.498 =\boxed{1.348\text{ kPa}} \]

Step 3 — Calculate humidity ratio

Formula:

\[ W=0.621945\frac{P_v}{P-P_v} \]

Entering air:

\[ W_1=0.621945\frac{3.376}{101.325-3.376} \]
\[ \boxed{W_1=0.02144\text{ kg/kg}} \]

Leaving air:

\[ W_2=0.621945\frac{1.348}{101.325-1.348} \]
\[ \boxed{W_2=0.008385\text{ kg/kg}} \]

Convert to grams per kilogram:

  • Entering air = 21.44 g/kg dry air

  • Leaving air = 8.385 g/kg dry air

Step 4 — Find the moisture difference

\[ \Delta W=W_1-W_2 \]
\[ \Delta W=0.02144-0.008385 \]
\[ \boxed{\Delta W=0.013055\text{ kg/kg}} \]

The AHU removes approximately 13.055 grams of water per kilogram of dry air.

5. Calculate dry-air mass flow

Because the airflow is given in m³/h, convert it into dry-air mass flow.

The specific volume of moist air per kilogram of dry air is:

\[ v=\frac{0.287042T_K(1+1.6078W_1)}{P} \]

Where \(T_K\) is absolute temperature in kelvin.

\[ T_K=35+273.15=308.15\text{ K} \]

Substituting the entering-air conditions:

\[ v\approx0.9030\text{ m}^3/\text{kg dry air} \]

Then:

\[ \dot m_{da}=\frac{\dot V}{v} \]
\[ \dot m_{da}=\frac{10,000}{0.9030} \]
\[ \boxed{\dot m_{da}\approx11,074\text{ kg/h}} \]

6. Calculate condensate production per hour

Now apply the moisture-balance equation:

\[ \dot m_w=\dot m_{da}\times\Delta W \]
\[ \dot m_w=11,074\times0.013055 \]
\[ \dot m_w\approx144.5\text{ kg/h} \]

Therefore:

\[ \boxed{\text{Condensate}\approx144.5\text{ litres/hour}} \]

7. Calculate daily condensate

For 24-hour continuous operation:

\[ V_{\text{daily}}=144.5\times24 \]
\[ \boxed{V_{\text{daily}}\approx3,468\text{ litres/day}} \]

Final AHU calculation

144.5

Litres/hour

3,468

Litres/day

Theoretical estimate at constant operating conditions, rounded to practical precision.

8. Calculate latent cooling load

Condensate also indicates the latent heat removed from the air.

\[ Q_L=\frac{\dot m_w h_{fg}}{3600} \]

Where:

  • \(Q_L\) = latent cooling load, kW

  • \(\dot m_w\) = condensate, kg/h

  • \(h_{fg}\) = approximate latent heat of vaporization, 2,450 kJ/kg

\[ Q_L=\frac{144.5\times2450}{3600} \]
\[ \boxed{Q_L\approx98.4\text{ kW}} \]

This is the approximate latent load only. The AHU's total cooling load also includes sensible cooling and may include other loads.

9. How to use the result in hospital facility management

Draw-Through Installation

A. Drainage design

Check the drain pan, trap, pipework, slope and discharge arrangement against the expected condensate rate and applicable design standards. Final sizing should allow for actual peak conditions and manufacturer requirements.

エアハンドリングユニット(AHU)のメンテナンスと修理のポイントとは?設備担当者が押さえておくべき重要な注意点と対策 | 関東一円の空調設備はMULTI INTECにおまかせ

B. Water recovery

Theoretical production is about 3.47 m³/day. Actual recoverable water will be lower or variable depending on operating hours, humidity and coil conditions. Assess water quality before reuse.

Remote Building Manager|Honeywell Building Automation

C. Energy management

Record airflow, entering and leaving temperature and RH, condensate volume, cooling-coil performance and operating hours. Trend these values to identify changes in moisture removal and energy performance.

10. Quick reference for CEM calculations

Required result

Formula

Humidity ratio

\(W=0.621945P_v/(P-P_v)\)

Moisture difference

\(\Delta W=W_1-W_2\)

Dry-air mass flow

\(\dot m_{da}=\dot V/v\)

Condensate per hour

\(\dot m_w=\dot m_{da}\Delta W\)

Daily condensate

\(V_{\text{daily}}=\dot m_w\times\text{hours}\)

Latent cooling load

\(Q_L=\dot m_w h_{fg}/3600\)

Important engineering note: Use the actual airflow basis and the correct air conditions. If the airflow is measured at the leaving condition, or the AHU mixes return air with outdoor air, the mass-flow calculation must reflect those conditions. For design, use measured data and an appropriate safety allowance rather than relying solely on a theoretical estimate.

Please details with diagram and pictures how to calculate Air conditioning Condensate in aga Khan Hospitalwith CEM

The moisture-balance method is consistent with the psychrometric principles described in the ASHRAE Handbook and HVAC engineering guidance.


11. Application at Aga Khan University Hospital (AKUH)

For AKUH, use the same method for individual AHUs and FAHUs serving clinical areas, operating rooms, ICUs, laboratories and general hospital spaces. The actual airflow and measured coil-entering and coil-leaving conditions are essential; the example above is not a measurement of an actual AKUH unit.

Bouw operatiecentrum UMCG | MedicomZes






John Siegenthaler: Keeping your cool | 2021-05-26  | Plumbing & Mechanical




HVAC Air Duct Readings with YJACK DEW Psychrometer P51 - Yellow Jacket Videos
10

A practical AKUH monitoring sheet should record:

Measurement

Where to check

AHU/FAHU asset ID

CMMS or equipment label

Airflow (m³/h)

Design data, TAB report or verified airflow measurement

Entering-air temperature and RH

Immediately upstream of cooling coil

Leaving-air temperature and RH

Immediately downstream of cooling coil

Condensate volume (L/h)

Collecting container or calibrated flow measurement

Chilled-water supply/return temperatures

Cooling-coil water connections

Operating hours

BMS or operating log

Drain pan and trap condition

Physical inspection


For clinical areas, condensate recovery must be assessed under hospital infection-prevention, water-quality and engineering requirements. Do not assume the collected water is suitable for clinical use or potable applications.

12. Recommended CEM performance report

Use this calculation as a baseline, then compare calculated condensate with measured condensate over the same operating period.


KPI

Calculation or purpose

Condensate rate

L/h

Daily condensate

L/h × actual operating hours

Monthly condensate

Daily production adjusted for actual operating days

Water recovery ratio

Recovered litres ÷ generated litres × 100%

Latent cooling load

Condensate rate × latent heat ÷ 3,600

Measurement variance

(Measured − calculated) ÷ calculated × 100%


A significant difference between calculated and measured condensate should trigger checks of RH sensors, airflow, cooling-coil condition, drain leakage, and operating conditions before concluding that the AHU is underperforming.

Recommended reference: ASHRAE Handbook—Fundamentals — psychometrics and moist-air processes. The Singapore National Environment Agency's ACMV training manual also provides worked examples of AHU moisture-transfer calculations.

Comments

Popular posts from this blog

Detailed schematic diagram of a chilled water system,

  Detailed schematic diagram of a chilled water system, illustrating how chilled water is produced and circulated to a fan coil unit (FCU) for air conditioning. The system involves several components and stages: + System Flow Overview Chiller Plant: The chilled unit produces cold water, typically around 6-7°C (43-45°F), by removing heat through a refrigeration cycle. Pump Section: The primary CHW pump circulates the chilled water from the chiller into the distribution network. hashtag Activate to view larger image,

Identifying Electric Motor Wear and Failure

Identifying Electric Motor Wear and Failure Identifying Electric Motor Wear and Failure Introduction Signs of Wear and Failure Prevention Strategies Diagnostic Tools Contact Introduction Understanding how to identify wear and failure in electric motors is crucial for maintaining the efficiency and longevity of your equipment... Signs of Wear and Failure Unusual noises or vibrations. Excessive heat generation. Frequent tripping of circuit breakers. Decreased performance and efficiency. Visual signs of wear on components. Prevention Strategies Implementing regular maintenance schedules, usin...

AHU vs FAHU – What’s the Difference?

  AHU vs FAHU – What’s the Difference? Introduction Air Handling Units ( AHU ) and Fresh Air Handling Units ( FAHU ) are essential components of HVAC systems designed to regulate and condition indoor air. While both units perform air circulation and filtration, FAHUs are specifically designed to handle fresh air intake , ensuring a controlled air exchange within buildings. Understanding their differences allows engineers, facility managers, and HVAC professionals to select the most appropriate system based on ventilation needs, energy efficiency, and air quality standards. 1. Definition & Functionality Air Handling Unit ( AHU ) An AHU is responsible for conditioning and distributing air within a building's HVAC system. It processes return air (recirculated air) by cooling, heating, filtering, and humidifying it. AHUs are typically used in commercial buildings, hospitals, factories, and residential complexes. Fresh Air Handling Unit ( FAHU ) FAHU is a specialized air handling ...